Solar for Salad Producer PDM

In October 2016, PDM Produce began construction of a new state of the art cold store and packaging plant. The plan is to install a new substation with a 1Mva import capacity and to cover the entire building with solar panels. Depending on the DNO export allowance and the design of the limiters, TGE Group are planning to install a 900kWp PV system. Based on the loads of the existing site and data analysis, we have predicted that the new system will cover over 20% of the overall energy requirements of the new building. Take a look at our video of the site construction site. Well keep you up to date with progress: